Thermal Power:
Abadan CCPP:
Located in Khoozestan province, Abadan city with a total plant capacity of 960 MW and configured as 4 GTGs and 2 STGs (160 MW each). The ACC was supplied for the steam portion of 320 MW. The owner is Tavanir. The erection started in 2010 while the plant has been operating since 2014.
Esfahan CCPP:
Located in Esfahan province, Zavareh city with a total plant capacity of 480 MW and configured as 2 GTGs and 1 STG (160 MW each). The ACC was supplied for the steam portion of 160 MW. The owner is Persian Steel Co. The erection started in 2011 while the plant has been operating since 2014.
Genaveh CCPP:
Located in Booshehr province, Genaveh city with a total plant capacity of 480 MW and configured as 2 GTGs and 1 STG (160 MW each). The ACC was supplied for the steam portion of 160 MW.The erection started in 2012 while the plant has been operating since 2015.
Behbahan CCPP:
Located in Khozestan province, Behbahan city with a total plant capacity of 480 MW and configured as 2 GTGs and 1 STG (160 MW each). The ACC design was supplied for the steam portion of 160 MW.The erection will start in 2016.
Kahnooj CCPP:
Located in Kerman province, Kahnooj city with a total plant capacity of 480 MW and configured as 2 GTGs and 1 STG (160 MW each). The ACC was supplied for the steam portion of 160 MW. The owner is Mahtaab Gostar. The erection has started in 2015.
Central CCPP:
Located in Assaluyeh area in south of Iran with a total capacity of 1500 MW and configured as 6 GTGs and 3 STGs (160 MW each). The ACC is supplied for the steam portion of 480 MW. The owner is Pars Oil & Gas Co. and the EPC contractor is Farab. The project is under execution.
Mazandaran CCPP:
Located in Mazandaran province, Nowshahr city with a total capacity of 480 MW and configured as 2 GTGs and 1 STG (160 MW each). This is the first F-Class Single Shaft power plant in Iran. The owner is Mahtaab Gostar and the EPC contractor is United Energy Developers (UED). The project is under implementation.
Qum CCPP steam add-on (2 x 150 MW)
Hormozgan GT (6 x 160 MW)
Rasht 2 x 25 MW GT
Loshan 2 x 60 MW GT
Hydro Power
equipment supply (400 KV GIS duct, control system, generators, etc.)
- Karun 1 extension
- Karun 3
- Karun 4, Godar –e- Lander
- Karkheh